Com.Int.El. undertook renovation works at the end of 2022 that involved the entire production area. These works were carried out in order to install a new laminate cutting machine.
The work began during the Christmas break with the relocation of a wall and the consequent resizing of the goods storage area.
Subsequently, the entire flooring of both the storage area and the production area was resurfaced.
Once the renovation work was completed, it was possible to install the new machinery, which is still in progress.